Calculadora de Concreto Online Grátis

Concrete volume and bags required for slabs, walls, footings and columns

🔥 Popular✨ Nova

The Concrete Calculator determines the exact volume of concrete needed for slabs, footings, walls, and columns, then converts that volume into the number of pre-mixed bags required based on bag weight. Contractors, DIY builders, and construction students use it to order the right amount of material — avoiding both costly over-ordering and frustrating mid-pour shortages.

Loading Concrete Calculator, please wait…

Concrete Calculator

Concrete volume and bags required for slabs, walls, footings and columns

Was this calculator helpful?
Report an Issue
Share:

Frequently Asked Questions

Concrete volume = Length × Width × Depth. For example, a 4 m × 3 m slab at 100 mm (0.1 m) thick = 4 × 3 × 0.1 = 1.2 m³. Always add a 10% waste factor, giving 1.32 m³ for this slab.
A 60 lb (27 kg) bag covers approximately 0.45 cu ft (0.0127 m³). For 1 m³ you need roughly 79 bags of 60 lb, or 59 bags of 80 lb. The exact number depends on the bag yield specified by the manufacturer.
Slabs and walls use cuboid volume (L × W × D). Round footings and columns use cylindrical volume (π × radius² × depth). The calculator handles each shape separately so you always get the correct formula for your pour type.
Pre-mixed bags are economical for small pours under 0.5 m³ (around 40 bags). For larger pours, a ready-mix truck is faster and cheaper per m³. The threshold is typically 1–2 cubic yards — consult your local supplier for quotes.
A standard general-purpose mix is 1:2:4 (cement:sand:aggregate by volume). For higher-strength structural work, use 1:1.5:3. The calculator assumes a standard mix; use the Cement Calculator for custom mix ratios.
Concrete pours always lose some material to spillage, uneven forms, and over-filling. A 10% waste factor is standard for slabs and walls. Footings and columns in unstable soil may need 15–20% more.
Our calculators use industry-standard formulas verified against academic sources and professional tools. Results are for informational and educational purposes — always verify important financial, health, or technical decisions with a qualified professional.
No. All calculations run entirely in your browser. Your inputs are never transmitted to any server, logged, or stored — complete privacy by design.
🔗Related Tools
🏗️Cement Calculator›⛱️Sand Calculator›🪨Gravel Calculator›📦Cubic Yard Calculator›📐Square Footage Calculator›

Sobre Esta Calculadora

O concreto é vendido por volume, mas aplicado em dimensões de comprimento, largura e profundidade. A conversão correta evita desperdícios e faltas de material.

A Calculadora de Concreto determina o volume exato de concreto necessário para lajes, fundações, paredes e colunas, convertendo esse volume na quantidade de sacos pré-misturados necessários. Empreiteiros e construtores usam essa ferramenta para pedir a quantidade certa de material.

Como Usar

  1. Selecione o formato da área que será concretada.
  2. Insira as dimensões (comprimento, largura e profundidade).
  3. O volume será calculado automaticamente em metros cúbicos.

Fórmula

Volume = Length × Width × Depth
Bags = Volume(cu ft) × 0.45 / Bag weight

Exemplo Resolvido

Calculating concrete for a 4 m × 3 m × 0.1 m patio slab

Entradas:

  • Length: 4 m
  • Width: 3 m
  • Depth: 0.1 m (100 mm slab)

Passo a Passo:

  1. Volume = 4 × 3 × 0.1 = 1.2 m³
  2. Add 10% waste: 1.2 × 1.10 = 1.32 m³
  3. Convert to cubic feet: 1.32 × 35.315 = 46.6 ft³
  4. 60 lb bags yield ~0.45 ft³ each: 46.6 ÷ 0.45 = 103.6 → 104 bags
  5. Or: 80 lb bags yield ~0.60 ft³ each: 46.6 ÷ 0.60 = 77.7 → 78 bags
Resultado: A 4 m × 3 m × 100 mm slab requires approximately 1.32 m³ of concrete — 104 sixty-pound bags or 78 eighty-pound bags, including a 10% waste allowance.

Dicas

  • Adicione 10% de margem de perda para qualquer concretagem para compensar derramamentos e enchimento excessivo.

Calculadoras Relacionadas

🏗️Cement Calculator⛱️Sand Calculator🪨Gravel Calculator📦Cubic Yard Calculator📐Square Footage Calculator

Ver todas as calculadoras de Construção →

Calculators Point

179+ free online calculators for finance, health, math, education and daily life. Fast, accurate, and 100% free — always.

Categories

💰 Finance & Money❤️ Health & Fitness📐 Math & Science🎓 Education & GPA🔄 Unit Converters🏠 Everyday Tools🏗️ Construction💻 Technology📊 Business

Popular Tools

EMI CalculatorCompound InterestSIP CalculatorSalary CalculatorDiscount CalculatorDebt Payoff Calculator401(k) CalculatorBudget Calculator

Guides & Tools

Home Loan EMI GuideCar Loan EMI GuideSIP Returns GuideBMI for AdultsTDEE & CaloriesInvestment ROIMortgage ComparisonCollege GPA Guide

Company

About UsContact UsAll CalculatorsSitemap

Legal

Privacy PolicyTerms of ServiceDisclaimerCookie Policy

Contact

contact@calculatorspoint.com
Advertising Disclosure: Calculators Point is a free educational platform. We may display advertisements to support the cost of running this service. Advertisers have no influence over our calculator formulas, results, or editorial content — all outputs are calculated independently. See our Privacy Policy and Disclaimer for details.
© 2026 Calculators Point. All rights reserved. Results are for informational purposes only.Made with ❤️ · MK INNOVEXA
✅🔒100% Private — All data stays in your browser. Never stored or shared.
Your Dimensions

🏗️ Your Inputs

ft
ft
in
🧮

Enter values to calculate

Your result will appear here instantly